Located in the Alta Verapaz area in Guatemala, the SAMUC small hydroelectric project has two pipelines that end up in the same machine room: the SAMUC I DN 400 pipeline and the SAMUC II DN 600 pipeline. Both were constructed with a cable crane transport system due to the complex installation conditions of the pipes.

  • Slopes of 480% (78°).  Almost vertical conditions in some cases.
  • Sections of different pressures up to a maximum allowable pressure of 52 bar.
  • Built with advanced Lok&Play® ductile iron technology.
Key points

  • Make an impossible project viable, safe and profitable.
  • Advising and checking until final pressure testing by the design team.

Benefits and advantages of our solution:

  • Does not require anchor blocks.
  • No expansion joints.
  • Very high installation ratio: Lok&Play®.
  • Very complex areas. Extreme slopes.
  • Admits very high pressures.
  • With or without trench.
  • No welding, no problems. Even in a flooded trench.
  • Minimal pressure head losses.
  • Guarantee of operation, without breakages or interruptions in service.
  • Replacement of obsolete steel pipes.